- Operates according to class 7 (ISO 14644-part 1)
- Approx. 80 air changes per hour in both areas
- 2 no. H14 type HEPA fan filter units
- Dimensions: approx. 15m2 (5.3 x 2.7 m) x 2.9m height
- Robust powder coated mild steel frame
- Clear and opaque hardwall panels
- Clear PVC strip curtain walls as entrance and internal divide
- Feedthrough for integrated LAF cabinet
- Bearing structure out of sight
- Fully flush ceiling finish for easy and fast cleaning
- Fascia boarding around full perimeter
- Integrated LED lighting with high output
- Digital speed controller with user set week programme
- Manufactured and delivered in several weeks from drawing approval
- Installed and validated within 3 days
The project
User is a Dutch company with branches in other countries including Slovakia. This company has the expertise in consulting, design and prototyping of electronics for various market segments.
To bring its electronics assembly, inspection, cleaning and packing activities in Slovakia to a higher quality, a modular cleanroom is placed there.
The modular cleanroom consists of two rooms; a room with cleanliness class ISO 8 with integrated ISO Class 5 LAF cabinet and a main room ISO Class 7. Assembly, inspection and packaging take place in the main room. The space serves as a combined goods- and dressing area.
Direct benefits for the user:
- Flush ceiling and frame – very easy to clean and keep clean
- Integrated flow cabinet in the room, with only the interface in the cleanroom
- Heat load is nil because of most efficient fan filter units with energy-efficient DC motor
- Lowest power consumption and thus lowest operating costs
- Short turnaround realisation
Check out our photo gallery with pictures of completed projects.
Want to know more?
ProCleanroom proved to be a reliable partner, supplying us with a turnkey cleanroom according to specification, within our budget and within our critical schedule.
Important to KONI was the short leadtime and installation time of the cleanroom. Because the demanding schedule was achieved, we could proceed with the commissioning of our FSD manufacturing line as scheduled.
Downflow project realized as scheduled. Perfect service and cooperation. Satisfactory result within budget and available time.