
Taking the national safety measures into account because of the COVID-19 virus, the relocation of the large and 4,2 m high 330m2 ISO class 7 softwall cleanroom has been completed by our engineers. Even with these dimensions, the EC fan filter units ensure optimum airflow within the cleanroom which resulted in an ISO class 5 validation in the as build state! The cleanroom is now ready for operation and will be used for the clean assembly and test of high tech modules.