- ISO class 7/8 (ISO 14644-part 1).
- 4 no. H14 type HEPA fan filter units equipped with high capacity prefilters.
- Dimensions: ca. 51 m², 2.6m int. height.
- Filter units equipped with high capacity prefilters.
- Robust powder coated mild steel frame.
- Bearing structure out of sight.
- Fully flush ceiling and fascia boarding around full perimeter.
- Self closing swing doors.
- 2 no. Sliding harmonica softwall curtains, black and transparent.
- LED lighting according to a predetermined lighting plan.
The Hardwall cleanroom
This ISO-Class 7 and 8 modular hardwall cleanroom is installed at the premisis of Machinefabriek Westerhof in Denekamp. With an established reputation as reliable partner in mechanical engineering, Machinefabriek Westerhof has devoted more and more time to serving the semiconductor industry in recent years. As a sector essential to the production of advanced electronic components, this industry is constantly looking for high-quality tooling, precision machinery and technical support to meet the stringent demands of this industry.
In this dynamic environment, Machinefabriek Westerhof has proven to be a partner that not only supplies high-quality products, but also offers tailor-made solutions that meet the unique needs of the semiconductor industry. Due to their close involvement in the sector, Westerhof understands the complexity and the urgent need for precision and cleanliness.
With the latter need in mind, the decision was made to invest in their own cleanroom. Our contact person at Westerhof, Jeroen Bos explains to us; “ProCleanroom provided us with excellent help and advice during this step. Partly because of this advice, we decided to invest in a modular hardwall ISO-7 cleanroom, in combination with furniture and consumables, specifically aimed at our process.” The furniture and advice for choosing the right cleanroom products suitable for the work process of Machinefabriek Westerhof is fully carried out by our Accessories & Consumables division. The specialists of this division, together with Westerhof, looked at the wishes and requirements and based this on a package of products.
The cleanroom is installed in an existing part of the building and to make optimal use of the available space, it was decided to construct the cleanroom from the modular hardwall cleanroom system. This type of cleanroom is quite suitable for critical environments that need to achieve a higher cleanliness grade (ISO-class 4 to 7). The Flexible design can be dismantled, relocated and is adjustable to changing needs.
The ISO-7 cleanroom is designed in such a way that different types of products can be assembled, cleaned and packed. The design and layout of the cleanroom, including the tools, air flows, Personnel Airlock (Pal) and material airlock (Mal) areas, are tailored to specific needs and product requirements. In order to separate the different rooms and maintain maximum passage width, (softwall) curtains have been used on a harmonica system. Black softwall curtains were chosen around the installation area to eliminate ambient light during the UV control.
- Full turnkey solution – design, hardware, installation, furniture and accessories: a single point of contact.
- Maximum cleanliness performance
- Fast installation and flexibility.
- Lowest power consumption and operating costs in the market.
Check out our case studies for more completed projects
Interested in what we can do for you?
Other projects
[vc_testimonial author=”G. v. Tiel” company=”Weener – Medical devices”]ProCleanroom delivered as promised, on schedule and provided the consultancy we required[/vc_testimonial]
[vc_testimonial author=”Leading organic Electronics manufacturer “]We are very pleased with the services provided. The clean benches were supplied and installed in time and meet our and our clients expectations.[/vc_testimonial]
[vc_testimonial author=”B. Scholte” company=”KONI – Automotive”]Important to KONI was the short leadtime and installation time of the cleanroom. Because the demanding schedule was achieved, we could proceed with the commissioning of our FSD manufacturing line as scheduled.[/vc_testimonial]